Send Message
Home ProductsLauncher Crane

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

Certification
China Henan Dowell Crane Co., Ltd. certification
China Henan Dowell Crane Co., Ltd. certification
Customer Reviews
Our company is DOWELL's old customer, several years has ordered a double beam overhead crane and single beam bridge crane

—— Sedanur BAYDAR

I'm Online Chat Now

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty
Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty
Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

Large Image :  Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

Product Details:
Place of Origin: China (Mainland)
Brand Name: Dowellcrane
Certification: ISO CE BV CCC GOST SGS
Model Number: JQJ Beam Launcher Girder Crane
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Packaging Details: Electric and other parts are packed by high quality plywood crates, Main girder packaged by plastic film and woven plastic cloth
Delivery Time: 60days
Payment Terms: L/C, T/T
Supply Ability: 2000 Sets per Year

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty

Description
Lifting Speed: 0.7m/min Group Classification: 25%, A5
Condition: 100%new Warranty: 2 Years
Applicable Industries: Road Construction Leg Lift Speed: 0.222m/min
High Light:

launching crane

,

launching lifting equipment

400 Ton Bridge Girder Erection Crane For Highway And Railway Construction

 

Product Description

 

In addition to the standard bridge operation, the 400 Ton Bridge Girder Erection Crane can also meet the requirements of first and last span
erection, curve erection, variable span erection, span continuous beam, combination beam, continuous steel structure, etc. Existing bridge erection, simple support span continuous erection and other working conditions.It has the advantages of simple erection, fixed point hoisting, good lifting stability, high operating efficiency, safety and reliability, easy to adjust span and easy to operate.

 

Product Characteristics

  • The arm can move up and down, move back and forth, swing the head to the left and right, can set up an inclined bridge (0-45 °), a slope bridge 5% (in Yunnan, Malaysia, Greece, the Zui slope is up to 8%), small curve convenient and quick;
  • The whole machine adopts step-by-step advancement, and the guide arm passes through the hole;
  • It adopts gear and rack drive, which has good self-locking performance.
  • Relying on driving to drive the outriggers forward, no need to configure the outriggers vertical movement force;
  • Use the electric machine to move horizontally to realize the full-scale mechanized falling beam;
  • Adopt the hydraulic cylinder to push and add the whole machine to move the way, once the falling edge beam is in place;
  • The outriggers use the driving power to achieve longitudinal movement and reduce the power of the whole machine;
  • The electrical system is controlled by a programmable controller, with good interlocking performance, preventing two directions from acting simultaneously, effectively controlling misoperations, and ensuring safety and reliability.

Maintenance

  • Routine maintenance: (performed by the on-duty driver before, after and during operation)

1. Clean the dust and oil on the driver's cab and airframe regularly to keep the inside and outside of the machine as clean as possible;
2. Check whether the brake clearance is appropriate;
3. Check whether the keys and coupling bolts on the coupling are tight;
4. Check whether each safety device is sensitive and reliable;
5. check the wear of brake belts and wire ropes;
6. Check if the contacts of the controller are close and consistent;

  • Second level maintenance (per month by the driver)

1. Fill the rolling bearings with grease;
2. Check the insulation of all electrical equipment;
3. Whether the control screen, protection panel, controller, resistor, each terminal block and terminal nut are tight;
4. Check the oil quantity of the reducer, the oil quantity of the brake hydraulic solenoid and the lubrication condition. When the amount of oil is insufficient, lubricating oil and grease should be added.

  • Third and second level maintenance (once quarterly or semi-annually. Under the guidance of technical staff, performed by the driver)

1. Lubricate the rolling bearing;
2. check the insulation of all electrical equipment;
3. Whether the control panel, protection panel, controller, resistor, each terminal block, and the connection nut are tight.
The above is the maintenance method of the bridge crane. For large machines such as bridge cranes, we must remember to carry out maintenance work regularly in a certain way, and we must not neglect to prevent engineering delays and losses due to insufficient daily maintenance.

 

Parts Of Crane

 

Bridge Girder Launcher Crane 400 Ton For Highway Railway Construction 2 Years Warranty 0

 

 

Contact Details
Henan Dowell Crane Co., Ltd.

Contact Person: Mr. June Chao

Tel: 0086 18568525956

Fax: 86-373-8506-666

Send your inquiry directly to us (0 / 3000)