Installation of Winch
Set up an operating shed, and ensure that the operator can see the commander and the dragged or lifted objects clearly. During the construction process, the buildings, scaffolding, and on-site stacked materials and components should not affect the driver's monitoring of the entire process within the operating range. When operating a shed in a hazardous work area, the top should meet the requirements of a protective shed.
Ensure that the foundation is strong. The hoist should be kept away from the dangerous operation area as far as possible, choose a place with higher terrain and firm soil, and bury the ground anchor with a steel wire rope to lock the hoist base, and pile up the front to prevent the hoist from moving and overturning.
Pay attention to the direction of the roll. The reel is aligned with the center of the guide pulley. According to regulations, the distance from the reel to the first guide pulley: the grooved reel should be more than 15 times the width of the reel, and the non-slot reel should be more than 20 times the width of the reel to prevent the wire ropes from overlapping and wearing when the reel is running.