Product Details:
|
Power Suplly Mode: | Cable Drum Or Line Sliding | Work Duty: | A5-A7 |
---|---|---|---|
Power Source: | 3 Phase 380V 50hz | Application: | Bridge Building |
Condition: | New | Warranty: | 2 Years |
High Light: | launching crane,launching lifting equipment |
600T Girder Erection Machinery Full Span Beam Launcher Equipment
Product Description
600T Girder Erection Machinery Full Span Beam Launcher Equipment merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.
Hydraulic System Operation
Notes On Operation
Before the electromechanical starting equipment of the Girder Erection Machinery Full Span Beam Launcher Equipment , the operator must carefully check the various parts that are fastened and lubricated, and make all the preparations before startup according to the operating regulations before starting to use. During the operation of the machine, the Girder Erection Machinery Full Span Beam Launcher Equipment should be monitored at all times. If abnormal conditions (such as severe vibrations, abnormal sounds, abnormal odors, leaks, temperature, pressure, etc.) are found during the operation of the various departments and the status of the instrument's indication signals, the Girder Erection Machinery Full Span Beam Launcher Equipment should be stopped and inspected; when the machine is not stopped, it should not touch the rotating parts and perform maintenance. When repairing and welding the steel structure of the working device, it is prohibited to use the machine body as a ground wire and provide protection during welding; electrical equipment must be repaired by a full-time electrician, and the power must be cut off before repairs, and a "prohibited closing" sign or send someone to guard the gate to prevent accidental power transmission; the power supply voltage must be the same as the rated voltage of the electrical equipment. All electrical equipment should be installed and qualified electric shock protectors on the line. The steel structure shall adopt protective zero connection and lightning and anti-induction devices; the oil used in the hydraulic system shall comply with the type and brand of hydraulic oil specified in the relevant instructions, keep the hydraulic oil clean, and the temperature of the hydraulic oil shall be maintained in the range of 30-80 degrees During use, control the oil temperature as much as possible, and do not exceed the allowable upper limit.
Parts Of Crane
Package & Delivery
Contact Person: Mr. June Chao
Tel: 0086 18568525956
Fax: 86-373-8506-666