Product Details:
|
Crane Travel Speed: | 5m/min | Feature: Bridge Crane Condition: New Place Of Origin: Henan, China Brand Name: Do: | 380v 3p Or Customized |
---|---|---|---|
Condition: | 100%new | Lifting Speed: | 0-1m/min |
Warranty: | 24Months | Color: | Customized |
High Light: | launching crane,launching lifting equipment |
300 Ton Concrete Lifting Crane Bridge Girder Launcher For Metro
Product Description
300 Ton Concrete Lifting Crane Bridge Girder Launcher For Metro is used for erecting concrete box girders for high speed (250km, 350km) passenger railway lines. This machine is suitable for equal span girders or different span girders which can be 20m, 24m and 32m, 50m. The rear part has two supports. One of the supports is "C" shape column with rotary and foldable technology. The "C" shape column technology saved the traverse space during traveling and which enables to travel through tunnels with the girder transfer vehicle.
The Hoist of Girder Launcher Crane
Influence of impurities on girder launcher crane
Although 300 Ton Concrete Lifting Crane Bridge Girder Launcher is relatively stable equipment, but it is also susceptible to the impact of external factors in the process of operation, which also include some impurities. These impurities may have a fatal impact on the highway bridge machine, so it is necessary to take some relevant preventive measures, small make up for you in detail.
The impurities that can have adverse effects on highway bridge erection machines mainly refer to dust, soil and other non-metallic objects and metal scraps, wear products, etc. When these impurities enter the interior of the highway bridge erection machine, they will not only hinder the normal movement of various parts in the equipment, but also accelerate their wear. And can also cause damage to the equipment, the performance is the temperature of parts, lubricating oil deterioration, etc.
How to solve this problem?
First of all, avoid as much as possible 300 Ton Concrete Lifting Crane Bridge Girder Launcher in some harsh environment work;
Secondly must use the high quality suitable lubrication products, reduce the presence of impurities;
Once again to the road bridge machine for comprehensive protection, to prevent impurities into;
When a fault occurs, it should be repaired in time to prevent the problem from becoming serious.
Parts Of Crane
Contact Person: sales
Tel: +8618568525960