Send Message
Home ProductsLauncher Crane

Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System

Certification
China Henan Dowell Crane Co., Ltd. certification
China Henan Dowell Crane Co., Ltd. certification
Customer Reviews
Our company is DOWELL's old customer, several years has ordered a double beam overhead crane and single beam bridge crane

—— Sedanur BAYDAR

I'm Online Chat Now

Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System

Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System
Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System
Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System

Large Image :  Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System

Product Details:
Place of Origin: China (Mainland)
Brand Name: Dowellcrane
Certification: ISO CE BV CCC GOST SGS
Model Number: JQJ Beam Launcher Girder Crane
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Packaging Details: Electric and other parts are packed by high quality plywood crates, Main girder packaged by plastic film and woven plastic cloth
Delivery Time: 60days
Payment Terms: L/C, T/T
Supply Ability: 5000 Sets per Year

Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System

Description
Main Lifting Speed: 4.5m/min Span: 18-35m
Application: Outdoor Steel Track: QU70
Aux.lifting Speed: 12.7m/min Power Supply: 3 Phase 380V 50hz Or Request
High Light:

launching crane

,

launching lifting equipment

Bridge Girder Erection Launcher Construction Machine with Hydraulic System

 

Product Description

 

The Bridge Girder Erection Launcher Construction Machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.

 

 

Precautions

  • In the early stage of work, check the brakes, wire ropes, hooks and other safety devices. If abnormalities are found, they should be eliminated in time;
  • Workers should confirm that the power can be turned off when there are no people in the aisle or on the track. When the power supply is short-circuited or there are signs, the power should be turned off by the relevant personnel
  • During the work, when lifting heavy loads in each shift, the weight should be lowered after 0.5 meters above the ground, and the brake performance should be checked to confirm the reliability before normal operation;
  • When the driver is working, he should ring the bell according to the relevant regulations;
  • Strictly implement the ten no-hangs principle;
  • Two-hook cranes are not allowed to lift two objects at the same time by two hooks; adjust the brake of the lifting mechanism without working;
  • The operator must go to work after getting the appropriate examination and field study license.

Disassembly and Maintenance

 

When removing the truss beam, it should be supported by the sleeper raft, which should be firm and reliable. High-strength bolts dismantled after flame heating need to be scrapped and not inherited. Workers entering the demolition site need to wear safety caps and protective shoes. Workers working on truss beams need to be secure and fully strapped. This is the basic security protection for operating bridge installation equipment.

 

On-site Installation

 

Erection Launcher Crane Construction Machine Bridge Girder With Hydraulic System 0

Contact Details
Henan Dowell Crane Co., Ltd.

Contact Person: Mr. June Chao

Tel: 0086 18568525956

Fax: 86-373-8506-666

Send your inquiry directly to us (0 / 3000)