Send Message
Home ProductsGantry Crane

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN

Certification
China Henan Dowell Crane Co., Ltd. certification
China Henan Dowell Crane Co., Ltd. certification
Customer Reviews
Our company is DOWELL's old customer, several years has ordered a double beam overhead crane and single beam bridge crane

—— Sedanur BAYDAR

I'm Online Chat Now

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN
Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN
Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN

Large Image :  Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN

Product Details:
Place of Origin: China (Mainland)
Brand Name: Dowellcrane
Certification: ISO CE BV CCC GOST SGS
Model Number: MG
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD 23000-100000 SET
Packaging Details: Main body packaged by high quality water-proof plastic woven cloths; spare parts are packed in high quality plywood box.
Delivery Time: 35 work days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 5000 Sets per Year

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN

Description
Product Name: Double Girder Gantry Crane Span: 3~40m
Cantilever Length: 0-15m Lifting Speed: 5-15M/MIN
Trolley Running Speed: 20-40M/MIN Crane Running Speed: 30-50M/MIN
Control Method: Cabin Control/wire Rope Remote Control Power Supply: 3 Phase 380V 50hz Or Request
Work Duty: A5~A7 Control: Remote , Pendant Line , Cabin
High Light:

Electric Double Girder Gantry Crane

,

40m Double Girder Gantry Crane

,

Double Girder Gantry Crane 50M/MIN

Industrial Use A Frame Lifting Electric Double Girder Gantry Crane

 

Double Girder Gantry Crane Description

 

Double Girder Gantry Crane is more powerful and the gantry crane design is more complex. It is mainly used to lifting heavy loads, with high working strength, in sever working condition, or with other special working demands.
Double Girder Gantry Crane composed of gantry, crane crab, trolley traveling mechanism, cab and electric control system, the gantry is box-shape structure, the track is at the side of each girder and the leg is divided into type A and type U according to user’s requirements.
Double Girder Gantry Crane could be ground control, remote control, cabin control or both, in the cab there are adjustable seat, insulating mat on the floor, toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air condition, acoustic alarm and interphone which can be furnished as required by users.

 

Double Girder Gantry Crane Parameters

 

Item
China Manufacturing Customized Double Girder Gantry Crane
Loading capacity
5~160t
Hoisting height
6~30m
Span
18~35m
Hoisting mechanism
Electric winch trolley
Working Class
A5
Power supply
380V 50Hz 3Ph or custom made

 

Double Girder Gantry Crane Drawing

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN 0

 

Double Girder Gantry Crane Details

 

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN 1

 

Features of Double Girder Gantry Crane

 

 

  • Double girder gantry crane, Compact structure design, Reliable and Trustable
  • Limit switch for lifting and long traveling, protect from colliding
  • Improved travel system help double girder gantry crane running more smoothly
  • Easy and comfortable operation make your working a high efficiency

 

 

Quality Insurance

 

  1. Strict weld inspection process
  2. Strictly control the size of each item
  3. Strict production and process control, QC inspection control
  4. All four corners are strictly polished
  5. Cover and protect some parts before painting to ensure the quality of painting
  6. The entire crane is pre-assembled and tested before delivery to ensure that the crane is free of dimensional errors and quality issues

 

Package & Delivery

 

  1. Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
  2. Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation.
  3. Only the best transport solution will be taken for saving your cost uttermost on finance, security and time.

 

Electric Double Girder Gantry Crane Industrial Use A Frame Lifting 50M/MIN 2

 

 

Our Service

 

1. We have a professional sales team,can privede u a quick and professional reply.
2. Exclusive engineer support at any time, so we can design within 24 hours.
3. 2 year warranty for whole machines, providing all parts free of charge.
4. Low charge for continue maintenance when warranty is expired.
5. c an produce the largest tonnage crane,just give us your demand.
6. We can provide free training to end-users, don't worry about the installation.
 
FAQ
 
If you want to order this double beam gantry crane, Pls tell me the details as follows:
The Max lifting capacity? (Ton)
The span of gantry crane?(the distance of rail to rail center)
Do you need cantilevers at two beam ends? if it is, Pls mention the length per side.
The Max. lifting height of hook? (or total height of crane?)
What type meterial will you to lift?
The power source standard?(380V, 50Hz, 3phase or others)

Contact Details
Henan Dowell Crane Co., Ltd.

Contact Person: Mr. June Chao

Tel: 0086 18568525956

Fax: 86-373-8506-666

Send your inquiry directly to us (0 / 3000)