Product Details:
|
Product Name: | Girder Launcher Crane | Color: | Customized |
---|---|---|---|
Current Overload Protection System: | Include | Voltage Lower Protection Function: | Include |
Warranty: | 2 Years | Place Of Origin: | Henan, China |
Rated Lifting Moment: | 500kn | Span: | 50M |
Lifting Speed: | 0-1m/min | Power Supply: | 380v 3phase Or Customized |
High Light: | Girder Launcher Crane,Truss Type Girder Launcher Crane,50M Girder Launcher Crane |
High Performance Lifting Machinery Truss Type Girder Launcher Crane
Girder Launcher Crane Description
Introducing our cutting-edge Girder Launcher Crane! This innovative piece of machinery is designed to make your construction projects more efficient and cost-effective, while also ensuring maximum safety for your workers.
This powerful crane is specifically engineered to handle the needs of large-scale bridge construction. With a lifting capacity of up to 150 tons, it can easily handle even the heaviest girders. In addition, the Girder Launcher Crane features a unique launching system that enables it to quickly and efficiently install girders without the need for external cranes or lifting equipment.
One of the key advantages of our Girder Launcher Crane is its remarkable flexibility. It is capable of handling girders of varying lengths and widths, allowing you to complete projects of all sizes with ease. The crane also features a user-friendly control system, which enables operators to precisely maneuver and position the girders with ease.
Moreover, the crane has a robust and stable structure, which ensures maximum safety for operators and workers alike. It is built using high-quality materials and components, and adheres to stringent safety standards.
In conclusion, our Girder Launcher Crane is an exceptional piece of equipment that delivers superior performance, reliable operations and maximum safety for your workers. It is specifically designed to meet the unique demands of large-scale bridge construction, making it an ideal choice for contractors and construction companies looking to maximize productivity and minimize costs. Invest in our Girder Launcher Crane today and experience the ultimate in crane technology!
Parts Details of Girder Launcher Crane
Girder Launcher Crane Parameters
Product Model | SH50-160 | SH40-140 | SH40-120 | SH35-120 | SH30-80 |
Span (m) | 50 | 40 | 40 | 35 | 30 |
Lifting Capacity (T) | 160—260 | 140 | 120 | 120 | 80 |
Crane Moving Speed (m/min) | 2.7 | 2.7 | 2.7 | 2.7 | 2.7 |
Trolley Moving Speed (m/min) | 4.5 | 4.5 | 4.5 | 4.5 | 4.5 |
Trolley lifting Speed (m/min) | 0.8 | 0.8 | 0.8 | 0.8 | 0.8 |
girder-carrying speed of rear part (m/min) | 0-9 | 0-9 | 0-9 | 0-9 | 0-9 |
Skew Bridge Angle (°) | 45 | 45 | 45 | 45 | 45 |
Applicable curve radius (m) | R350 | R300 | R300 | R300 | R300 |
Power (KW) | 96 | 96 | 96 | 96 | 96 |
Girder Launcher Crane Advantages
♦ It's light weight, transportation, installation and removal is very convenient
♦ The Beam Launcher represents a good stability, high efficiency, safety and reliability, easy to adjust variable cross and easy to operate
♦ The legs do not through the bridge deck when longitudinal move, no need to lay vertical moving orbit, reduce the pressure on the deck
♦ It has three method picking up the precast beam: from rear end of the beam launcher on the deck level, from below on ground level, or from bridge side
Girder Launcher Crane Safety Features
Shenghua BL Series are designed for safety. Winches are equipped with double breaking system. Upon request we provide Triple breaking system. Emergency stop button, Limit switch, sensor are located at designated location. Lighting and spare-parts are part of the items coming with our beam launcher.
Packing and Delivery
Packing methods:
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery methods:
1. If the size of 150 ton concrete T beam launcher are suitable for container ship, usually by container;
2. If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time:
Within 30 to 40 working days after the receipt of deposit.
Transportation:
generally 35 days to 50 days to destination port.
FAQ
1. What’s the information should I provide when inquiry about the 150 ton concrete T beam launcher?
1.1 We need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
1.2 The Girder/beam drawing;
2. What are inspection standard for load test of 150 ton concrete T beam launcher?
2.1 Dynamic load test 1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.
2.2 Static load test 1.25 times rated load, all mechanisms work well, the crane stops 20-30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;
3. How to make highway bridge concrete girders?
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
4. How about maintenance of 150 ton concrete T beam launcher?
4.1 Lubricating: Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.
4.2 Steel wire rope: Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.
4.3 Spreader: The spreader has to be checked regularly.
4.4 Pulley block: Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.
4.5 Wheels: Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness; Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.
4.6 Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.
5. How many Personnel and equipment to assemble 150 ton concrete T beam launcher in the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several
Gradienter: 1 set
Contact Person: Mr. June Chao
Tel: 0086 18568525956
Fax: 86-373-8506-666