Product Details:
|
Crane Running Speed: | 50-100M/MIN | Lifting Speed: | 5-15M/MIN |
---|---|---|---|
Trolley Running Speed: | 20-40M/MIN | Control Method: | Cabin Control/wire Rope Remote Control |
Power Supply: | 3 Phase 380V 50hz Or Request | Colour: | Request |
High Light: | double girder crane,overhead travelling crane |
Removable Electrical Lifting Trolley 10 Ton Double Girder Overhead Crane
Product Description
1. Operation room of Removable Electrical Lifting Trolley 10 Ton Double Girder Overhead Crane is divided, closed and insulated in three types.
2. The platform entrance of the control room of the double-beam bridge crane can be divided into three types: side, end and top.
3. Removable Electrical Lifting Trolley 10 Ton Double Girder Overhead Crane can be divided into indoor and indoor two kinds. When ordering, the technical requirements such as working environment, air temperature and power type should be indicated.
4. Overload limiter, large screen display and various protective devices are added to further increase the safety in the process of use.
5. Removable Electrical Lifting Trolley 10 Ton Double Girder Overhead Crane generally adopts the air operation mode, which is different from other ground operation cranes.
Product Main Features
Removable Electrical Lifting Trolley 10 Ton Double Girder Overhead Crane is mainly composed of bridge frame, trolley, electric equipment, etc. According to the frequency of use, it can be divided into A5, A6 and A7 working levels. The operation of hook bridge crane is completed in the driver. Main parameters of removable electrical lifting trolley 10 ton double girder overhead crane: Lifting weight: 5 ~ 10 tons, 16/3.2 ~ 50/10 tons, 75/20 ~ 100/20 tons, 100/32 tons 125/30 tons. Span: 10.5 ~ 31.5 meters, 13 ~ 31 meters. Lifting height: 6 ~ 30 m.
Installation Specification
1. the metal structure of the various inspection indicators according to the provisions, in order to reduce the amount of high-altitude operation, the installation of equipment, wiring and so on as far as possible in the ground.
2. the crane must be installed in accordance with the following method before erection, if found the problem to eliminate in time, if the user can not deal with please immediately contact the factory, when the crane erection on the factory, the factory can not deal with this kind of problem.
Production Process
Contact Person: Mr. June Chao
Tel: 0086 18568525956
Fax: 86-373-8506-666